Latest Posts

Baysox schedule
(Aug. 3-9)


P-Nats schedule
(Aug. 3-9)


More posts linked via sitemap.

E-mail Everett W. via DCAbloob at everett.will@gmail.com

DCAbloob
A totally unofficial blog of Washington, D.C. area news and views.
Main page - Sitemap - Demographic profile - Subscribe in a reader - Twitter
Monday, June 29, 2009

Metro Red Line reopens for full service after crash
______________________

The Metro Red Line reopened for full service Saturday in time for the start of Monday morning rush. However, train speeds have been restricted on the line to 35 mph, slower between the Fort Totten and Takoma stations through the crash site segment in NE Washington, D.C. according to WMATA.

Additionally, trains on all Metrorail lines are now stopping at the start of the platform prompting WMATA to state its preference for riders boarding six car trains to move to the front end or center of platforms.

The slower speeds combined with the crowding of trains led to a litany of negative comments Monday morning from riders on Twitter and other forums. Shuttle buses were technically available but kept as a reserve noted the Washington Post.
______________________

Labels: , , , ,

posted by Everett W. @ 12:55 PM - Sphere - 0 Comments - Click here to have your say.
DCAbloob poll
Should the Washington Redskins attempt to sign Michael Vick?

View current results
free polls and surveys @ www.votations.com
DCAbloob poll
Should the Washington Redskins attempt to sign Michael Vick?

View current results
free polls and surveys @ www.votations.com


Latest Posts

Keys schedule
(Aug. 3-9)


Blue Crabs schedule
(Aug. 3-9)


More posts linked via sitemap.